Progress Report
We progress report so donors can see exactly where their support goes. This page reflects the current state of the build as of March 2026.
Every phase, every dollar — in the open.
JULY 2026
First section of the fence complete
Workers raced the rain through 9 bags of cement, then started a new section once 25 bags ran out and another 50 were bought (receipt given). By the 7th one part of the fence was finished, الحمد الله — and 20 lengths of iron rod were bought for the pillars on the next section. Three Sierra Leonean helpers from the land dispute, and Sister Aisha visiting from America, were welcomed to the group chat.
Brickmaking resumes, cement runs out
With the first section's bricks all used up, brickmaking resumed for the next stretch despite heavy rain — 500 of the 800+ needed are ready, and cement has run out, so more needs buying this week.
1–8 Jul
15–16 Jul
4 April
5–16 April
First truck of sand delivered, 50 bags of cement bought, on-site monitoring begins with Abu Bakr Kamara and Mohammed Musa.
Blockmaking runs from 508 up to 2,071 blocks, with 150 more bags of cement and another sand truck brought in along the way. Foundation digging for the fence begins by the 16th, and receipts have been sent.
Ground broken on fence and well
Blockmaking and foundation prep
APRIL 2026
SEPTEMBER 2024
Land Donated
The land was donated by Aunty Seray Bayoh, elder sister of Aunty Fatima. May Allah reward her greatly for this gift.
JUNE 2025 – JANUARY 2026
Land clearing
Clearing of the land ran from June 2025 through January 2026, ahead of the fence and well works that followed.
MARCH 2026
Architectural plans drawn up
Architectural plans for the fence were drawn up, setting the scope for the works that followed in April.
Blocks made
2,071
Cement bags
187
Loads delivered
3
MAY 2026
Concrete lining begins
Granite stone and two truckloads of ball stone delivered, and work starts on the concrete lining for the fence.
Donated to Aunty Fatima
$200
Pillars installed
7+
Cement bags bought
25
4–20 JUNE
5–16 April
$100 donated to Aunty Fatima on the 4th and again on the 17th — work resumed the same morning, with blocklaying continues, with 7+ pillars installed.
Blocklaying continued through the week, reaching 7 pillars installed by the 27th. Brother Abass and Brother Sulaiman Foray both visited the site, and 25 bags of cement, 6 bolts, and 10 packets of nails were bought for the pillar work.
Work resumes
Blocklaying continues, pillars go up
Stone loads delivered
3
Fence stage
Concrete lining
JUNE 2026
Stone loads delivered
3
Fence stage
Concrete lining
Stone loads delivered
3
Stone loads delivered
3
Helping visually impaired students access education, care, and opportunity
Reach out to our team
UK Contact: Mariama Bayoh
+44 7427 173620
USA Contact: Fatima Bayoh
+202 840 2326
SL Contact: President Salieu Conteh
+232 76 538351
SL Contact: Brother Abass Fofanah
+232 99 226808